Updated
Pin coins

Tools › Position size

Position size calculator

Risk-based sizing, checked against the price at which the position is actually closed. At 10× the liquidation sits 5.26% from the entry and the stop 5.00% away, so the stop executes first. Entry defaults to ONDO’s mark price, $0.50362.

Not investment advice — modelled figures from stated assumptions. Terms and disclaimer

ONDO long — where the stop sits against liquidation 5.26% from entry to liquidation at 10× · your stop is 5.00% away
Liquidation $0.47711 Stop $0.47844 Entry $0.50362

The stop is reached first, so the loss is bounded by what you budgeted. Liquidation lies further from the entry than the stop does, which is the whole test. Distances are to scale; the liquidation price is the venue’s tier-correct one.

coinliqui.com modelled
Position size
9928.5147
ONDO · notional $5,000
Liquidation at 10×
$0.47711
beyond your stop
Closed out by a move of
5.26%
you sized for 5.00%
Max leverage for this stop
10×
keeps liquidation beyond $0.47844
The stop is reachable. Liquidation sits at $0.47711 (5.26% away), past your stop at 5.00%, so the stop executes first and the loss is bounded by the $250.00 you budgeted. Leverage up to 10× keeps that true.

Why sizing alone is not enough

The standard formula — risk budget ÷ distance to stop — sizes the position so that if the stop fills, you lose exactly what you budgeted. It says nothing about whether the stop is reachable. Leverage sets the liquidation price independently, and when liquidation falls between entry and stop the exchange closes the position first. The stop is then decoration.

The check has to use the tier-correct liquidation price. At $5,000 notional this contract sits in tier 1, where maintenance margin is 5.000% — so at 10× liquidation sits 5.26% from entry, where the common entry × (1 ∓ 1/leverage) formula reports 10.00%: $0.02386 of room that is not there. Both are measured from entry, so the two percentages compare directly. ONDO’s tier-correct liquidation against the formula, on its contract page →

Fees, slippage and funding are not deducted here, and a gap through the stop can exceed the budgeted loss regardless of sizing. Maintenance margin is read at the tier your notional falls in; a size large enough to cross a boundary moves it further.

What leverage this contract actually allows → · ONDO detail →

Who produced this, and what they hold

Produced and published by Yury Fokin as Coinliqui, an independent project with no legal entity. No payment, sponsorship, affiliate or referral arrangement exists with any venue named here, and nothing paid influences which coins or venues appear — coverage is decided by the open-interest floor stated on Data sources. The operator may hold positions in coins covered here; nothing published is timed, ordered or selected around one.